Last additions |

"Merlin"122 views"Merlin" at the end of the line at Hunthouse Wood with a maintence train.Sep 18, 2023
|
|

"Lady Jane Grey"124 views"Lady Jane Grey" discharges its passengers at the end of the line at "Hunthouse Wood"Sep 18, 2023
|
|

Rudyard Kake119 viewsView of the lake from the train.Sep 18, 2023
|
|

Rudyard Lake112 viewsView from the train of the LakeSep 18, 2023
|
|

"Nelly"108 viewsSep 18, 2023
|
|

"Rudyard Lady"110 viewsNot running on this date - Rudyard Lady is a Bo-Bo type diesel engined locomotive. It has a Perkins 3 cylinder diesel engine linked by a four speed gearbox to the wheels.Sep 18, 2023
|
|

"Nelly"111 views"Nelly arriving back at Rudyard sttion.Sep 18, 2023
|
|

"Lady Jane Grey" 113 views"Lady Jane Grey" capured in the station loop"
Lady Jane Grey" was built in 1996 at Bressingham by Gray EngineeringSep 18, 2023
|
|

No 8 "King Arthur" 115 viewsNo 8 "King Arthur" arriving back at Rudyard station with a maintence train.Sep 18, 2023
|
|

No 8 "King Arthur"107 viewsNo 8 "King Arthur" arriving back at Rudyard station with a maintence train.Sep 18, 2023
|
|

"Lady Jane Grey"106 views"Lady Jane Grey" was built in 1996 at Bressingham by Gray Engineering Sep 18, 2023
|
|

"Lady Jane Grey"108 viewsLady Jane Gray was built in 1996 at Bressingham by Gray Engineering .Sep 18, 2023
|
|

No.6 -"Excaliber"113 viewsSeen here with its boiler in front of it having a boiler refit and rebuild outside the engine shed
Excalibur is a coal fired 2-4-2 tank engine. Works No. 293 it was built in 1993 by Exmoor Steam RailwaySep 18, 2023
|
|

No.7 - "Merlin"109 viewsNo.7 Merlin is a coal fired 2-4-2 tank engine. Works No. 296 it was built in 1998 by Exmoor Steam Railway.Sep 18, 2023
|
|

"Merlin" & "Lady Jane Grey" 108 views"Merlin" & "Lady Jane Grey" out side the engine shedsSep 18, 2023
|
|

4-4-2" - Waverley"109 viewsWaverley is a 4-4-2 tender engine No. 196 built by David Curwen of Devizes in 1948 and called Black Prince.
She is a 4-4-2 “Atlantic” locomotive and originally had an American appearance with a high footplate around the boiler. Sep 18, 2023
|
|
| 10063 files on 629 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
53 |  |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|